Skip to main content

Judge-Proof Numbers, Exposed Reasons: What Meta v Commission (T‑1078/23) Demands of DMA Designation Decisions


On 3 June 2026, the General Court handed down Meta Platforms v Commission (Case T‑1078/23), its second full ruling on the merits of gatekeeper designation under the Digital Markets Act (DMA). It follows Bytedance v Commission (Case T‑1077/23, now under appeal). The scoreboard is lopsided. Meta had challenged the designation of two of its services. The first challenge concerned Messenger, which the Commission had classified as a core platform service in the shape of a messaging tool – in the DMA’s terms, a number-independent interpersonal communications service forming an important gateway between business and end users. That challenge was dismissed in its entirety (para. 209). The second concerned Facebook Marketplace, classified as a different kind of core platform service: an online intermediation service, again an important gateway. Meta failed on every ground but one. What remains is a single annulled provision: Article 2(f) of the designation decision of 5 September 2023 (the contested decision), which classified Marketplace as an online intermediation service (OIS) core platform service (CPS) that is an important gateway (para. 271).

The tempting reading is vindication: the designation machinery survived contact with one of the best-resourced applicants it will ever face. That reading is accurate but incomplete. The interesting object in this judgment is not what the Commission won but the mechanism of what it lost, because the mechanism is repeatable. The Court did not find that Marketplace fell outside the online-intermediation category. It found that the Commission had assessed the classification within the wrong timeframe, and had failed to state adequate reasons for that classification in the face of facts that had changed five weeks before the contested decision was adopted. The exposed surface is therefore not the qualitative classification as such — Meta’s substantive attack on Messenger’s classification failed — but the adequacy of the Commission’s reasoning on qualitative classification, tested against the facts as they stand on the day the designation decision is adopted. Such decisions must now be drafted to be accurate to the day, against a notifying party that controls the facts.

What designation does, and the two roads to it

A word on what is at stake in the label, for readers who do not spend their days inside the DMA world. To designate a company as a “gatekeeper” for a given service is not to fine it or to find that it has done anything wrong. It is to switch on a standing code of conduct. From designation, a defined set of obligations under Articles 5 to 7 of the DMA begins to bite within six months: duties to allow interoperability, to refrain from self-preferencing, to let business users reach their own customers, and more. The label is a trigger, not a verdict.

There are two roads to it. The first is quantitative and largely automatic. A company that clears certain size thresholds (turnover, user numbers, durability over three financial years) is presumed to be a gatekeeper, and can escape only by rebutting that presumption with compelling evidence. The second is qualitative. Where the numbers do not decide the matter, the Commission may designate a company after a market investigation, on a reasoned assessment of its actual position. Meta’s designation ran on the first road: the thresholds were met, the presumptions applied, and Meta’s attempt to rebut them failed.

That is where the case turns, and the turn is easier to follow if the reader has it in advance. The two roads run on two different clocks. The quantitative presumption looks backward, at a closed record of the last three financial years that the company can no longer change. The qualitative classification of a service looks at the present, at what the service is on the day the decision is signed, and the present is something the company can still move. Meta moved it. Five weeks before the Commission adopted its decision, Meta changed Marketplace in a way that, on the Commission’s own chosen measure, arguably emptied it of the very users that made it a gatekeeper service. The Commission’s designation decision did not adequately reckon with that change. The rest of this piece is about why that failure matters well beyond Marketplace.

Everything else held: presumptions, rebuttals, substance

Almost everything in the judgment held. The rest of the judgment consolidates the deferential architecture built in Bytedance. Arguments presented under Article 3(5) of the DMA must directly relate to the quantitative criteria and must manifestly call the presumptions of Article 3(2) into question (paras. 117–118). Meta’s rebuttal evidence broke against that standard. Its headline multi-homing figure (73% of end users using more than one online messaging service) concerned Germany in a single year, 2021, and could not carry a Union-wide conclusion (para. 127). Its equal-treatment comparisons with Samsung’s internet browser, Apple’s iMessage, Alphabet’s Gmail and Microsoft’s Outlook failed on comparability (paras. 141–143). Evidence produced for the first time before the Court was inadmissible: rebuttal material must be put to the Commission during the administrative procedure, or not at all (para. 133). And absent a substantiated rebuttal, there was no obligation to open a market investigation under Article 17(3) of the DMA (para. 171).

The substantive qualitative attack fared no better. Messenger could be regarded as the chat functionality of Facebook and still be classified as a distinct core platform service (paras. 95 and 99). The Commission had, in any event, analysed the specific conditions and circumstances in which Messenger is provided (paras. 101 and 104).

For anyone budgeting designation litigation, the plainest lesson of the first two designation judgments is where not to spend: frontal attacks on the presumptions, and on the classifications themselves, now carry poor odds. If the numbers held and the substance held, what broke must lie somewhere else.

The error of law: two assessments, two timeframes

That somewhere else is the seam between the DMA’s two kinds of assessment. Article 3(2)(c) of the DMA ties the presumption of an entrenched and durable position to thresholds met in each of the last three financial years. That is a retrospective exercise, and the Court accepted it without difficulty (para. 222). Classification of a service as a core platform service under Article 2(2) of the DMA is a different task. It is a qualitative assessment linked to the nature of the service, and for it the legislature set no retrospective window at all (paras. 224–225). In the absence of such a window, the default principles of EU administrative law govern: the legality of an act is assessed on the facts and the law as they stood on the date of its adoption, and sound administration requires the Commission to examine the file diligently and impartially so that it holds the most complete and reliable information available at that moment (para. 226).

The contested decision took the opposite position. Recital 256 stated that only information from the last three financial years, 2020 to 2022, needed to be considered, so that the changes Meta made to Marketplace in 2023 had no bearing on its classification. At the hearing, the Commission abandoned that position (para. 227). The Court found it incompatible with Article 3(3) of Implementing Regulation 2023/814, which requires a notifying undertaking to report without undue delay any material change in the facts while the notification is under review — a duty with no purpose if such changes could not affect the outcome (para. 228). The contested decision had confused the timeframe governing the quantitative thresholds with the timeframe governing qualitative classification, and had applied the wrong legal timeframe to the latter (para. 229).

The structural consequence deserves to be stated plainly, because the Court had no need to. The quantitative limb of a designation decision rests on a closed historical record that the notifying firm can no longer revise. The qualitative limb floats on the live present, which the firm can. A holding about timeframes is, in substance, a holding about the allocation of power between regulator and regulated.

Anatomy of a reasoning failure

The chronology matters. In its notification of 3 July 2023, Meta announced changes capping Marketplace listings at 20 per month in the same category, and at 5 per month in each of the “Vehicles”, “Auto parts” and “Properties for sale or rent” categories. The caps went live on 31 July 2023. Meta’s reply of 3 August 2023 to the Commission’s preliminary view confirmed their nature and exact scope (paras. 252–254). The contested decision was adopted on 5 September 2023, within the 45-working-day window laid down in Article 3(4) of the DMA.

Against that record, the Court found three defects, in ascending order of severity.

First, vagueness. The contested decision engaged the changes “at most in a marginal fashion” (para. 243). Recital 262 of the contested decision, the principal recital addressing them, was itself vague and hypothetical. Users publishing at the capped volumes “could still be considered business users depending on the factual circumstances”, it said, without ever specifying which circumstances. That left the statement of reasons incomplete (paras. 244–246).

The second was temporal mischaracterisation. Recital 262 referred to the caps as “future limitations that Meta was in the process of implementing”, although the Commission had been informed twice, in the notification and in the reply to the preliminary view, that they were already in force (paras. 251–256). The recital thus presented as prospective a change that had already taken place, and the contested decision nowhere explained that treatment.

The third defect was the sharpest, and it concerns the proxy lock-in. Marketplace has no formal category of business accounts, so the Commission identified business users through a proxy drawn from Meta’s own internal systems: “power sellers”, meaning users in the Union creating at least 28 listings in any month of the financial year, at least 80% of them in the same category (para. 215). Meta’s caps set the maximum possible number of monthly listings below that proxy’s own threshold, and Meta stated, uncontradicted by the Commission, that, after 31 July 2023, Marketplace had no business users at all on the Commission’s chosen metric (paras. 247–248). Having built the classification on that proxy, the Commission owed one of two things. It could reason through the proxy to show why the second condition of the online intermediation definition was still satisfied: the condition drawn from , Article 2(2) of the P2B Regulation, and incorporated by Article 2(5) of the DMA (para. 233) that the service allows business users to offer goods or services to consumers. Alternatively, the Commission could explain expressly why the proxy no longer governed. It gave neither, with the result that neither Meta nor the Court could understand why the classification still stood (paras. 250 and 257).

Nor could the defect be repaired after the fact. The other recitals of the contested decision, including screenshots of listings post-dating the changes, could not cure the insufficiency (paras. 258–262). Reasons supplied at the litigation stage, such as the arithmetic that a capped user could still publish 240 listings a year in the same category, were not in the contested decision and could not be substituted for it (paras. 264–265). It was correct, as a general proposition, that a merely formal change to terms and conditions does not take a service outside the online-intermediation definition. But that proposition did not relieve the Commission of explaining how it had assessed this particular change (para. 266). And the comfortable margin by which the 10,000 business-user threshold had been cleared in 2020–2022 was no answer to a question about the state of the service in September 2023 (paras. 267–268).

Reasons review meets the moving target

An objection virtually writes itself. Annulment for breach of the duty to state reasons is a routine remedy in administrative law. The standard the Court recites is boilerplate: under the second paragraph of Article 296 TFEU, the statement of reasons must disclose the institution’s reasoning clearly and unequivocally, assessed in context, without addressing every point of fact and law (para. 240). And deploying intensive reasons review in place of substantive second-guessing is one of the oldest techniques of EU judicial review. On this view, T‑1078/23 holds nothing new.

The objection misses how hard the technique bites in this setting, because three features of DMA designation operate together. The first is a finite clock, whichever route the file takes: 45 working days from complete notification in the standard procedure under Article 3(4) of the DMA (here, barely five weeks passed between the implementation of the caps and adoption); and an endeavour deadline of five months where a sufficiently substantiated rebuttal leads the Commission to open a market investigation under Article 17(3). The second feature is an informational monopoly: the proxy was Meta’s internal metric, and the usage data through which any analysis of the caps had to run were Meta’s. The third feature is the ex ante design itself: classification is not a finding about past conduct but a trigger, with the obligations of Articles 5 to 7 of the DMA biting within six months (Article 3(10); para. 32).

Combine the three and the judgment yields what any litigator will recognise as a moving-target playbook: implement a late, self-notified change calibrated to break the regulator’s chosen proxy, then attack the reasoning the regulator had to finalise against the clock, using data only the firm holds. The deadlines vary by route; the exposure does not because on every route the assessment date is the date of adoption, and the facts remain the notifying party’s until that day. The crux, in other words, is not the calendar but the statement of reasons. The Court’s answer — analyse the change specifically or lose the classification — is doctrinally impeccable and operationally severe. The discipline does run both ways: rebuttal evidence withheld during the administrative procedure is inadmissible before the Court (para. 133), so a firm that engineers a late change and sits on the supporting data does so at its own risk. But the timing asymmetry favours the firm, and the incentive is unlikely to be lost on the next notifying party.

What a designation decision must now do

The defects are correctable, and correcting them is a matter of drafting and institutional practice, not legislative repair. Four obligations follow from the judgment.

First, treat self-notified late changes as live facts requiring specific analysis as at the date of adoption of the designation decision. The Court’s complaint was, at bottom, vagueness: the contested decision never said which circumstances would still make a capped user a business user (paras. 244–246). A recital that names the change and states its concrete effect on each condition of the classification survives judicial review; a hypothetical formula does not.

Second, proxy discipline. A proxy adopted is a proxy owned. Where the Commission borrows an identification metric from the firm’s own systems, it must either reason through that metric to the end (including when the firm’s conduct empties it), or state expressly why it no longer governs (paras. 249–250). The deeper lesson concerns selection: a proxy the notifying party can switch off with a unilateral product change is a liability built into the decision’s foundations. The same lesson reads in reverse for the firms because the Commission’s chosen proxy is now a known pressure point, and its choice might be scrutinised on both sides of the next file.

Third, temporal hygiene. The quantitative thresholds and the qualitative classification now run on distinct temporal disciplines, and the decision must be drafted accordingly: the three-year lookback belongs to Article 3(2) of the DMA, while classification under Article 2(2) is judged on the facts as they stand on the day of adoption (para. 229). Where the two are allowed to bleed into each other, the Court will find the inconsistency.

Fourth, use the machinery the framework already contains, while understanding its limits in time. The material-change duty in Article 3(3) of Implementing Regulation 2023/814 gives the case team a formal trigger for structured late-stage reassessment within the designation window, and Article 4 of the DMA supplies the safety valve of amendment. That was the route the Commission in fact took in April 2025, when it repealed Article 2(f) after Marketplace fell below the 10,000 business-user threshold (paras. 25–26). But repeal and annulment do different work in time. Repeal operates ex nunc: it ends the designation for the future and does not amount to recognition of its illegality. Annulment operates ex tunc: it removes the act retroactively from the legal order (para. 30, citing the judgment of 9 September 2011, Dow AgroSciences and Others v Commission, T‑475/07). A repealed act ceases to exist; an annulled act is deemed never to have existed. That difference is why the 2025 repeal did not deprive Meta’s action of its object: the obligations that had bitten on 7 March 2024 lay beyond repeal’s reach, and only annulment could touch them (paras. 30–33). The lesson for the drafting table follows: amendment can absorb a moving target, but only annulment rewrites the past. The reasoning must therefore be built to survive review from the first day, not merely to be amendable on the last.

The exposed limb, going forward

After T‑1078/23, the central issue in designation litigation shifts. It moves away from whether the quantitative thresholds are met, since often they will be, and the resulting presumptions will hold. It moves toward whether the Commission’s account of what the service is can withstand scrutiny, in light of facts that may remain in the notifying party’s hands until the day of adoption. Some calibration is due: this is a General Court judgment, resting substantially on Bytedance, which is itself under appeal. It marks an emerging pressure point, not settled architecture. But the direction of pressure is clear enough to act on now.

It will be felt most where a designation has no quantitative presumption to fall back on at all: where classification rests entirely on the qualitative, market-investigation route of Article 3(8) of the DMA, and the statement of reasons is the only thing holding the designation up. The clock offers no shelter on any route: 45 working days under Article 3(4), five months where a rebuttal leads to a market investigation under Article 17(3), twelve months on the Article 17(1) horizon. On every one of them, the facts may remain primarily within the notifying party’s knowledge or control until the day of adoption. The target moves whatever the calendar says and the constant is the demand for reasons that keep up. The question the judgment leaves open is the one the next designations will answer: whether the Commission can sustain a qualitative classification through sufficiently robust reasoning, despite an evolving factual record and informational asymmetry, without sacrificing the speed and certainty that justify ex ante regulation in the first place. The DMA was designed to spare its enforcer the long evidentiary sieges of Article 102 TFEU. T‑1078/23 is a reminder that what the co-legislators saved in proof, the Court will collect in reasons.

Author's Note

The views expressed here are the author’s own and are made in a strictly personal capacity; they do not represent the position of any institution with which the author is or has been affiliated.

Cite this post (OSCOLA)

J G Cortes, 'Judge-Proof Numbers, Exposed Reasons: What Meta v Commission (T‑1078/23) Demands of DMA Designation Decisions' (European Law Blog, 15 July 2026) doi:10.21428/9885764c.282264a8 accessed 7 November 2026.